BC
Bioreactor
Goals & Specifics
Techniques
Performance
Monitoring
Photos
Contact Us
Photos
all
/
installations
/
around bioreactor
/
gas-to-energy project
Surface Gravity Trench Excavation
Surface Gravity Trench Installation
Surface Gravity Trench Rock Installation
Surface Gravity Trench Fabric Installation
Surface Gravity Trench Wellhead, Valving, and Cleanouts
24" Perimeter Gas Main
Condensate Recovery Sump
Leachate Pond
Leachate Control Panel
Leachate Control Panel Monitoring
Leachate Testing
Leachate Gathering
Leachate Valves
Methane Valves
Cells 1-5 Coverage
Cell 6
Employees
Trashmaster
Gas to Energy Facility
Gas to Energy - Flare Station
Gas Treatment Skid
Jenbacher Engine
Jenbacher Engine Enclosure
Gas to Energy Monitoring